A Hive of Activity
Coastal Earthmoving Contractors will be onsite for 4 days to do all the site prep for the house. They have a huge list including 100m of trench for water and power, septic tanks and leach drains, excavate sand pit, provide level sand pad for house and water tank, put sand in round yard, 160m of trench for irrigation round summer paddock, remove rocks and level summer paddock for planting. We have trucks, bobcats and diggers all over the place.
Facebook